Prepare accurate equipment details
Record the nameplate manufacturer, model, serial number, kVA, voltage, phase, and equipment type. Include clear photographs of the plate, exterior, terminals, and visible damage.
Describe whether the unit is operating, stored, or out of service, and note leaks, missing parts, or other known concerns. Existing oil, PCB, or other records can be shared if available.
Understand the offer review
An offer depends on the particular transformer, its condition, ownership, safety, available documentation, and the purchase and removal scope the parties mutually agree.
Include location, access, loading arrangements, and timing when requesting review. The buyer covers freight, and payment is upfront according to the agreed transaction terms.
Plan safe coordination
No test is required simply to request an offer. If test results already exist, they may help describe the equipment, but do not arrange testing solely to begin an inquiry.
The seller’s qualified personnel handle electrical isolation and disconnection. Confirm responsibilities for loading, site access, and any removal work before equipment handling is scheduled.
Do I need to test a transformer before asking for an offer?
No. Testing is not required simply to request an offer. Provide available nameplate details, condition information, photographs, and any existing oil, PCB, or other records.
