Build a Reliable Inventory
Record each transformer’s nameplate voltage, kVA, phase, serial number, fluid type, dimensions, and location, with photographs of access and condition.
Note which units are accessible, obstructed, or near operating equipment; provide existing oil, PCB, and other records if available.
Set Sequence and Hold Points
Define shutdown windows, access approvals, exclusion zones, fluid controls, temporary storage, and checks before each phase proceeds.
Protect adjacent energized assets and coordinate switching authority, environmental review, rigging, and loading with qualified personnel before work begins.
Agree Responsibilities Beforehand
The seller’s qualified personnel handle electrical isolation and disconnection; specify who prepares each unit and who manages each agreed removal task.
No test is required to request an offer. Payments are upfront, freight is covered by the buyer, and removal scope is mutually agreed.
Can units be offered in stages rather than all at once?
Discuss the inventory, timing, condition, access, and proposed scope for each phase. Offers depend on those details and must be agreed before removal is scheduled.
