Start with the equipment
Send the nameplate ratings, including kVA and voltage, along with manufacturer information, photographs, operating status, and the transformer’s city or site location.
For equipment in a constrained yard or building, describe access, lifting limits, and loading arrangements. These details help define practical logistics without assuming a local office.
Records and valuation
A test is not required simply to request an offer. If available, provide existing oil, PCB, maintenance, inspection, or ownership records for consideration.
Offers depend on the transformer, condition, ownership, safety, records, and agreed scope—not merely the Alabama city. Payment is upfront for an accepted purchase, and buyer covers freight.
Plan the handoff
Purchase and removal responsibilities are mutually agreed, including loading, site access, and timing. Clarify who supplies equipment and prepares the unit for the agreed handoff.
Your qualified personnel must perform electrical isolation and disconnection. Do not try to disconnect or move energized equipment; discuss safe coordination before any removal.
Can I ask about a transformer located anywhere in Alabama?
You can submit an inquiry with its city, nameplate information, condition, and access details. Any offer and logistics depend on the unit and mutually agreed scope.
