Establish Authority and Boundaries
Identify the utility or site switching authority, equipment ownership, affected assets, and the boundary between electrical work, removal, and demolition.
The seller’s qualified personnel handle isolation and disconnection; define access, exclusion zones, sequencing, and protection of adjacent energized equipment.
Inventory Equipment and Records
List each transformer by nameplate details, including voltage, kVA, phase, serial number, and fluid type, with photographs and known condition.
Gather existing oil, PCB, test, maintenance, and ownership records if available. No test is required simply to request an offer.
Agree on Project Scope
Clarify responsibility for fluid controls, auxiliary equipment, rigging, temporary storage, loading, and final material disposition before scheduling work.
Offers depend on unit condition, ownership, safety, records, and scope. Payments are upfront, freight is buyer-covered, and removal responsibilities are agreed.
Does requesting an offer require a transformer test?
No. Provide available nameplate details, condition information, and records; any testing or additional project work must be separately coordinated and mutually agreed.
