Define the project scope
Identify medium-voltage, pad-mounted, or dry-type units being retired, and explain how removal relates to continued operations or replacement equipment installation.
Provide asset lists, one-line drawings, loading access, and any removal-window constraints. List UPS batteries separately so they are not confused with transformer equipment.
Nameplate and documentation
Send nameplate photos showing manufacturer, serial number, kVA, primary and secondary voltages, phase, frequency, impedance, and connection configuration where legible.
No test is required simply to request an offer. Existing oil, PCB, or other records may be provided if available, along with maintenance and inspection documents.
Agreed handling
Offers depend on the unit, condition, ownership, safety, records, and agreed scope. Clarify which equipment is included and how site access and loading will be coordinated.
The seller’s qualified personnel handle electrical isolation and disconnection. Payment is made upfront, and the buyer covers freight within the mutually agreed scope.
Should UPS batteries be included with a transformer list?
Identify batteries separately. Provide a clear transformer asset list and explain removal dependencies so the proposed equipment and scope can be evaluated accurately.
